Our Contact

822 – 470 Granville St. Vancouver, BC, V6C 1V5

Phone: 604.678.9587

Fax: 778.379.3899

corporate@doubleview.ca

Newsroom

Newsroom

Doubleview Gold Corp. Achieves a Major Breakthrough in Scandium Recovery from Copper Porphyry Tailings

Doubleview

November 25, 2025

Vancouver, BC, November 25, 2025 – Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (Frankfurt: A1W038) (“Doubleview” or the “Company”) is pleased to announce positive first-phase pre-optimization results from its two-year, novel scandium-focused metallurgical test program. These results confirm the technical viability of recovering high-purity scandium oxide alongside copper, gold, cobalt, and other metals from the […]

Doubleview Gold Corp. Highlights Scandium Potential at Hat Project, a Key Enabler for the Electrification Economy

Doubleview

November 20, 2025

Vancouver, British Columbia – November 20, 2025 – Doubleview Gold Corp. (TSXV: DBG, OTCQB: DBLVF, FRANKFURT: 1D4) (“Doubleview” or the “Company”), is a leading Canadian exploration company that is currently finalizing a Preliminary Economic Assessment (PEA) and updated Preliminary Resource Estimate (MRE) at its Hat Critical and Strategic Metals deposit in the so-called Golden Triangle […]

Doubleview Gold Corp. Closes Final Tranche of Non-Brokered Private Placement for Gross Proceeds of $7,181,400

Doubleview

November 19, 2025

Vancouver, British Columbia – November 19, 2025 – Doubleview Gold Corp. (TSX.V: DBG / OTCQB: DBLVF / FSE: 1D4) (the “Company” or “Doubleview”) is pleased to announce that it has closed the second tranche of its previously announced non-brokered private placement (the “Private Placement”) announced on November 7, 2025. The second tranche consists of 2,016,286 […]

Doubleview Gold Corp. Closes First Tranche of $5,700,000 Non-Brokered Private Placement

Doubleview

November 6, 2025

Doubleview Gold Corp. (TSX.V: DBG / OTCQB: DBLVF / FSE: 1D4) (the “Company” or “Doubleview”) announces it has closed the first tranche (the “First Tranche”) of its non-brokered private placement (the “Private Placement”) of non-flow-through units (the “Units”) as previously announced in the Company’s news release dated October 30, 2025. The Company is pleased to […]

Doubleview Gold Corp Announces Non-Brokered Private Placement of Flow-Through Shares at $1.00 per share along with Non-Flow-Through Unit

Doubleview

October 30, 2025

Doubleview Gold Corp. (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (the “Company” or “Doubleview”) is pleased to announce a non-brokered private placement of flow-through shares and non-flow-through units for gross proceeds of up to C$10,000,000 (the “Private Placement”). Proceeds of the Private Placement shall be used to fund the current exploration program and general working capital. Proceeds […]

Doubleview Announces Grant of Stock Options

Doubleview

October 23, 2025

Doubleview Gold Corp. (TSX.V: DBG / OTC: DBLVF / GERMANY: A1W038) (the “Company or “Doubleview”) announces it has granted incentive stock options to certain officers, directors and consultants of the Company to acquire an aggregate of 2,400,000 common shares in the capital of the Company at an exercise price of $0.80 (the “Options”) in accordance […]

Doubleview Gold Corp Announces 320-Meter Eastward Extension at the Hat Polymetallic Deposit, Expanding Mineralized Volume and Remaining Open

Doubleview

October 23, 2025

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to report that ongoing drilling at its 100%-owned Hat Polymetallic Deposit in northwestern British Columbia has extended the mineralized system approximately 320 meters eastward, further confirming that the deposit remains open in multiple directions. The 2025 exploration program continues to […]

Doubleview Gold Corp Announces Increased Footprint and Potential Volume at Its Hat Polymetallic Deposit in Northwestern British Columbia

Doubleview

October 1, 2025

Highlights:  This news release presents results from recent drilling in the southeast section of the Hat Project’s Lisle Zone. Drill holes H093, H094, H095, and H096 have significantly expanded the apparent volume of the mineralized zone, extending beyond the conceptual pit wall outlined in the 2024 Preliminary Mineral Resource Estimate. These results will be incorporated […]

Doubleview Gold Corp Announces Important High-Grade Copper and Gold Intercepts at Hat Polymetallic Deposit in Northwestern British Columbia

Doubleview

September 11, 2025

Highlights: 2025 season drilling totals 8,506 metres in 12 drill holes and is continuing. Drill hole assay intervals include some of the highest-grade mineralization intercepted to date at the Hat Project. Recent drill holes are extending the mineralization envelope of the Hat deposit and will be incorporated in the next Mineral Resource Estimate. Vancouver, British […]

Doubleview Gold Corp Initiates Advanced Exploration Program at Red Spring, Bolstering Its Critical Minerals Portfolio

Doubleview

July 28, 2025

Doubleview Gold Corp (TSXV: DBG) (OTCQB: DBLVF) (WKN: LA1W038) (FSE: 1D4) (“Doubleview” or the “Company”) is pleased to announce the commencement of an advanced exploration program at its 90%-owned copper-silver-zinc-gold Red Spring Project, located in central British Columbia, Canada. This initiative marks a significant step in unlocking the project’s full potential and reinforces Doubleview’s commitment to critical mineral […]